Building items the inspector looks for
Plan on four items from the state code. First, the escape opening for the unit’s sleeping rooms (see egress window installation). Second, alarms placed as in a new dwelling. Third, a separation from the main house that Utah lets you build with half-inch gypsum board on each side of the wall or under the floor, in place of the one-hour rating otherwise required between dwellings. Fourth, a possible inspection by the building official of any fire-rated work before the joints are taped.
The Utah electrical amendment lets the occupant of an accessory unit go without access to the disconnect serving the unit they live in. Entry, kitchen, bath and heating are drawn on the plan; the city decides what more it needs.
Taylorsville and internal ADUs
Taylorsville’s license, lot-size and parking conditions for an ADU are a local matter, and we do not state them here. Ask the city’s planning and building offices what they require before you spend on drawings.
About 72 percent of Taylorsville’s homes are one-unit houses and about 71 percent are owner-occupied, which is the kind of house the statute describes. It is not a count of basements.
Planning a unit starts with its three working parts, and each has its own page: basement bedroom for the sleeping room, basement bathroom for the fixtures and egress window installation for the opening. The Taylorsville Basement Finishing home page gives the whole-basement view, from framing to final walk-through.